{"product_id":"stitched-nylon-collar-long-lead","title":"Stitched Nylon and Leather Trim Dog Collar with Matching 213cm Lead, Collars S to L","description":"\u003cp\u003eThis stitched nylon dog collar with leather trim is built for comfort and everyday durability. Choose a collar in small, medium or large, or pick up the matching 213cm lead to complete the set.\u003c\/p\u003e\n\u003ch2\u003eKey Features\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eStitched Nylon:\u003c\/strong\u003e Neat, strong stitching throughout.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLeather Trim:\u003c\/strong\u003e Smart detailing with a classic feel.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMatching Lead:\u003c\/strong\u003e Long 213cm lead sold separately.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eThree Collar Sizes:\u003c\/strong\u003e S 34-40cm, M 36-42cm, L 39-45cm.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2\u003eSuitable For\u003c\/h2\u003e\n\u003cp\u003eCollars are 2cm wide. S fits necks 34-40cm, M 36-42cm and L 39-45cm.\u003c\/p\u003e","brand":"Pet Royale","offers":[{"title":"Small Collar (34-40cm)","offer_id":67798730014822,"sku":"SU00067042-S collar 2x34-40cm","price":22.99,"currency_code":"GBP","in_stock":true},{"title":"Medium Collar (36-42cm)","offer_id":67798730047590,"sku":"SU00067042-M collar 2x36-42cm","price":22.99,"currency_code":"GBP","in_stock":true},{"title":"Large Collar (39-45cm)","offer_id":67798730080358,"sku":"SU00067042-L collar 2x39-45cm","price":23.99,"currency_code":"GBP","in_stock":true},{"title":"Matching Lead","offer_id":67798730113126,"sku":"SU00067042-Traction 1x213cm","price":23.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0723\/0799\/8822\/files\/60afeb9c-4d80-4e85-ae3d-c4838c9cb20c.png?v=1792681644","url":"https:\/\/www.petroyale.co.uk\/products\/stitched-nylon-collar-long-lead","provider":"Pet Royale","version":"1.0","type":"link"}